Wastewater Treatment Plant Costa Rica – Regulations, Design & Reports
- CLEAN WATER GROUP
- 6 ago
- 1 Min. de lectura
Wastewater Treatment Plant Costa Rica: Full Guide 2025
If you're searching for a wastewater treatment plant Costa Rica, here’s a full breakdown: PTAR regulations, water quality standards, allocation data, required reporting, and SEO tips to rank higher on Google using Wix.
1. Key Regulations for Wastewater Treatment Plants (PTAR) in Costa Rica
Decree 42075‑S‑MINAE: infiltration requirements for treated wastewater, including design memory and infiltration testing.
Decree 39887‑S‑MINAE: technical design and PTAR system approval.
Decree 33601‑S‑MINAE: permissible limits (BOD, TSS, coliforms, pH).
Decree 39316‑S‑MINAE: sanitary handling of sludge and biosolids.
2. Drinking Water Quality & Operational Reports
Decrees 38924‑S & 37083‑S: standards for physical, chemical, and microbiological water parameters.
Semi-annual Report (Annex 3): mandatory for the Ministry of Health.
R‑0327‑2021‑MINAE Technical Manual: water allocation per use (L/person/day).





Comentarios